Our Investments

Investments Selected with Precision to perform with power

Ace & Apollo


260 N. Ace Yeager Ct. & 5725 W. Amelia Earhart Dr.
Salt Lake City, UT 82166
Type: Industrial
Size: 413,261
Built:
Investment Date: 7/1/2021
Strategy: Core / Core Plus
EverWest acquired two recently constructed class-A industrial buildings totaling 413,261 square feet located in the NorthWest quadrant of Salt Lake City, which has 60% of the overall inventory and consistently has the majority of absorption. The site is located less than 0.5 miles from interstate 80 and 5 miles from Salt Lake International Airport. Ace Industrial is a cross-dock facility with 32’ clear, 54.5’ x 43’ column spacing (60’ speed bays), ESFR, 78 dock high doors, 4 ground level doors, 4,000 amps, 32 trailer parking, and 247 auto. Apollo Industrial is a front park rear load facility with 28’ clear, ESFR, 24 dock high doors, 6 drive-in doors, 56’ x 45’ column spacing, and 150’ building depth.