Return To Blog

EverWest Acquires Build-to-Core Industrial Site

Brandon Woods Industrial Park - Greater Baltimore, MD

August 24, 2017

EverWest Real Estate Partners is pleased to announce the acquisition of Brandon Woods, an infill site located approximately 7 miles from BWI airport; 2.5 miles to the Key Bridge and 2 miles to I-695. The site is the last parcel available within the 3.0M square foot Brandon Woods industrial park in Curtis Bay, MD, which was largely built out in the 1990's.  
 
The proposed project represents a 139 acre land site that will allow for the development of three state of the art industrial buildings totaling 900,000+ square feet (a 500k+ s.f., a 300k+ s.f., and a 100k+ s.f. building) in an A location with its own designated access.  The development will take place in a joint venture with highly respected and active development partner Chesapeake Real Estate Group. 
 
Mark Bigarel, Managing Director with EverWest, comments, "It has been a tremendous effort by all involved to bring this last large industrial parcel within the submarket into a position to break ground, and I am excited for our team to begin construction on these state of the art distribution facilities." 
 
EverWest acquired the asset on behalf of a separate account with an institutional investor.